Why invest in Cargotec
On 27 April 2023, Cargotec's Bopard of Directors decided to investigate and initiate a process to potentially separate its core businesses Kalmar and Hiab into two standalone companies. On 30 May 2024, Cargotec's Annual General Meeting resolved on the partial demerger of Cargotec Corporation in accordance with the demerger plan. On 30 June 2024, the completion of the partial demerger of Cargotec Corporation was registered with the Finnish Trade Register. Read more
Announced orders published as stock exchange or press releases are listed here, smaller order releases have been excluded. You can access the original release via the link in the first column. All releases can be found here.
Date (and booking quarter) | Business area | Description | Country/Customer | Value |
30 September 2024 (Q3/24) | MacGregor | cargo access equipment for 12 Pure Car and Truck Carriers (PCTCs), with an option for eight additional vessels | HongKong/CIDO Shipping | Not disclosed |
Date (and booking quarter) | Business area | Description | Country/Customer | Value |
8 April 2024 (Q1/24) | Kalmar | six hybrid straddle carriers | France/Med Europe Terminal | Not disclosed (large order) |
3 April 2024 (Q1/24) | Hiab | WALTCO tail lifts | USA/a national discount retailer | Large order of EUR 7 million |
27 March 2024 (Q1/24) | Hiab | loader cranes to be used in offshore wind turbines | Not disclosed | Large order of EUR 5 million |
7 March 2024 (Q1/24) | MacGregor | a 100-tonne active heave-compensated (AHC) crane, a 20T Offshore crane and a 3T deck crane, and MacGregor's OnWatch solution, including 24/7 technical service support worldwide | Norway/VARD | Not disclosed (large order) |
5 March 2024 (Q1/24) | Kalmar | two new electric AutoStrads™, retrofitting of two existing hybrid straddle carriers | USA/APM Terminals | Not disclosed (large order) |
21 February 2024 (Q1/24) | Kalmar | two fully electric and eight hybrid straddle carriers | The Netherland/Hutchison Ports ECT Rotterdam | Not disclosed (significant order) |
Date (and booking quarter) | Business area | Description | Country/Customer | Value |
5 January (Q4/21) | Hiab | two WALTCO tail lift orders | USA/not disclosed | Combined value EUR 10.2 million |
1 December (Q4/21) | Kalmar | 4 diesel-electric straddle carriers | Jamaica/Kingston Freeport Terminal Limited (KFTL) | Not disclosed |
30 November (Q4/21) | Kalmar | three-year Kalmar Care service agreement | Sweden/Holmen Iggesund | Not disclosed |
25 November (Q4/21) | Kalmar | 34 Kalmar Straddle Carriers | Belgium/MPET and PSA | Not disclosed (significant order) |
18 November (Q4/21) | MacGregor | Design & key components, fabrication and delivery of hatch covers for twelve containerships | Japan/Japan Marine United | Not disclosed (significant order) |
Date (booking quarter) | Business area | Description | Country/Customer | Value |
6 October (Q3/21) |
Kalmar | six Kalmar Automatic Stacking Cranes (ASCs) |
Australia/Victoria International Container Terminal (VICT) |
Not disclosed (large order) |
4 October (Q3/21) |
Hiab | MOFFETT truck mounted forklifts worth EUR 7.5 million; heavy range HIAB loader cranes for EUR 3.7 million; HIAB X-HiDuo 072 and HIAB X-HiDuo 082 loader cranes from the light range worth EUR 1.7 million |
USA/not disclosed |
In total EUR 12.9 million |
4 October (Q2/21, Q3/21) |
MacGregor | RoRo equipment for 8 vessels: quarter and side ramps, hoistable car decks and rampway doors |
Not disclosed |
EUR 31 million, (Q2/21 (MEUR 9), Q3/21 (MEUR 22)) |
29 September |
Kalmar | Two RTGs, two empty container handlers and a reachstacker |
Indonesia/ |
Not disclosed |
16 September |
Kalmar | 15 medium electric forklift trucks | France/SEAC | Not disclosed (large order) |
26 August |
Kalmar | 18 hybrid shuttle carriers | US/The Port of Virginia® | Not disclosed |
28 July (Q3/21) |
Kalmar | 12 diesel-electric straddle carriers | Italy/Medcenter Container Terminal | Not disclosed |
8 July (Q2/21) |
Hiab | MOFFETT M8 NX truck mounted forklifts with connectivity enabled and premium access to HiConnect™ for two years | US | EUR 14.5 million |
6 July (Q2/21) | MacGregor | One electrical gangway system, one 3D compensated Colibri crane and a remote control station for two Commissioning Service Operation Vessels (CSOV) | Norway/Edda Wind | Not disclosed |
Date (and booking quarter) | Business area | Description | Country/Customer | Value |
24 May (Q2/21) | Kalmar | Two Kalmar Gloria reachstackers and three Kalmar diesel-electric straddle carriers | US/Tropical Shipping | Not disclosed |
28 April (Q1/21) | Hiab | 108 HIAB loader cranes with connected service HiConnect™ and ProCare™ Total Repair and Maintenance contracts for eight years | UK/Marshalls | EUR 4.9 million |
Date (and booking quarter) | Business area | Description | Country/Customer | Value |
31 March (Q1/21) | Kalmar | Six Kalmar AutoShuttles™ | Australia/Victoria International Container Terminal (VICT) | Not disclosed |
15 March (Q1/21) | Kalmar | 11 reachstackers, four empty container handlers and 12 heavy terminal tractors | Various countries/YILPORT Holding Inc. | Not disclosed |
11 March (Q1/21) | MacGregor | Electrically operated equipment, quarter stern ramps and doors, side ramps and doors, internal ramps and covers, internal doors, a liftable car deck, and the patented Load Monitoring System | Japan/Nippon Yusen Kaisha (NYK Line) | Not disclosed |
9 March (Q1/21) |
Kalmar | 12 fully automated AutoStrad™ straddle carriers | Australia/Patrick Terminals | Not disclosed |
8 March (Q1/21) | Kalmar | 2 rubber-tyred gantry cranes (RTGs), 3 reachstackers, 2 empty container handlers, 6 terminal tractors | Laos/Sitthi Logistics (Thailand) Co., Ltd. | Not disclosed |
24 February (Q1/21) | Hiab | 100 HIAB loader cranes | UK/MV Commercial | over EUR 5.7 million |
17 February (Q1/21) | Kalmar | 10 hybrid straddle carriers | Netherlands/Hutchison Ports ECT Rotterdam | Not disclosed |